calculated curve造句
例句與造句
- And the calculated results closely coincide with experimental results . furthermore , the paper , through applying the improved algorithm to the load - deflection curve and secondary load , also the calculated curves closely coincided with experimental results ( showed as chart 3 . 17 - 3 . 20 )
本文還將改進(jìn)的算法運(yùn)用于粘貼加固受彎構(gòu)件的荷載?撓度曲線和二次受力問(wèn)題的計(jì)算中,得出與試驗(yàn)結(jié)果吻合較好的計(jì)算曲線(圖3 . 17 3 . 20 ) 。 - Adopting the deformation harmony theory , the numeric calculation of the curve of load versus settlement is made . the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated . hence , under the condition of few or no static load test data , the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity , static cone penetration test and modification coefficient of depth , so it is remarkable to reduce the blindness of preliminary design of pile
通過(guò)室內(nèi)試驗(yàn)及原位測(cè)試指標(biāo)進(jìn)行理論計(jì)算與現(xiàn)場(chǎng)實(shí)測(cè)值的對(duì)比,筆者引入了施工工藝修正系數(shù)k _ ( c1 )和k _ ( c2 )及深度修正系數(shù),使理論計(jì)算值與現(xiàn)場(chǎng)實(shí)測(cè)值具有良好的一致性,進(jìn)而通過(guò)變形協(xié)調(diào)理論對(duì)荷載?沉降曲線進(jìn)行數(shù)值計(jì)算,并用不同施工工藝的實(shí)例說(shuō)明了理論計(jì)算荷載?沉降曲線與實(shí)測(cè)荷載?沉降曲線的擬合效果,從而達(dá)到可在不做靜載荷試驗(yàn)或少做靜載荷試驗(yàn)的情況下通過(guò)剪切波速和靜力觸探試驗(yàn)指標(biāo)以及施工工藝修正系數(shù)等預(yù)測(cè)黃土地基中鉆孔灌注樁承載性狀,這對(duì)于工程初步設(shè)計(jì)中減少設(shè)計(jì)的盲目性具有十分重要的現(xiàn)實(shí)意義。 - Comparing with the approached curve and the calculated curve , the credibility of numerical simulation result and the feasibility of predicting the ground settlement through numerical simulation are verified . so it can be used to analyze the structure settlement due to the tunnel construction with shield
本文利用數(shù)值模擬計(jì)算得到的指定斷面地表沉降與實(shí)際測(cè)量結(jié)果基本吻合,這充分說(shuō)明只要建立合理的數(shù)值模型,采用合理的計(jì)算參數(shù),數(shù)值模擬是研究盾構(gòu)施工力學(xué)過(guò)程的有效工具。 - We presents a detailed studied of the linewidth of parametric light in clbo - opo caused by the linewidth of pumping beam , off axis phase matching , divergence angle of pumping , time above threshold , high gain coefficient of nlo crystal , fluctuate of cavitylength , spontaneous radiation , according to the momentum and energy conversion laws , and the sellmeier equations of the clbo , we calculated curves of the type - i and type - ii compared with the bbo ' s
根據(jù)能量動(dòng)量守恒關(guān)系和clbo的色散方程,詳細(xì)分析了由于泵浦光的線寬、泵浦光偏軸泵浦、泵浦光的發(fā)散角、泵浦光功率超過(guò)參量光振蕩閾值一定倍數(shù)、高增益系數(shù)、有效腔長(zhǎng)波動(dòng)以及自發(fā)輻射引起的參量光線寬,并得到了與bbo晶體在類、類相位匹配下比較的理論曲線。 - It's difficult to find calculated curve in a sentence. 用calculated curve造句挺難的